SIRC signed its sixth contract with European Space Agency.
The project is entitled – RFIC frontends for remote sensing.
The project started on the 1st February 2020 and will last 36 months.
SIRC signed its fifth contract with European Space Agency.
The project is entitled – Monopulse radar sensor as a proof-of-concept for future miniaturized radar sensor fit for small satellites.
The project started on the 1st June 2017 and will last 18 months.
SIRC signed its fourth contract with European Space Agency.
The project is entitled – Highly integrated W-band receiver in BiCMOS technology.
The project started on the 1st July 2017 and will last 24 months.
SIRC signed its third contract with European Space Agency.
The project is entitled – Integrated W-band transmitter in IHP SiGe BiCMOS SG13S technology.
The project started on the 1st August 2016 and will last 24 months.
In December 2015, SIRC signed its second contract with European Space Agency.
The project is entitled – Silicon integrated circuits for receiver paths of phased-array radar systems in the 8-12 GHz band.
The project starts on the 4th January 2016 and will last 26 months.
On the 28th November 2014, SIRC signed its first contract with European Space Agency.
The project is entitled – Integrated low-power Ka-band receiver in SiGe BiCMOS technology for remote sensing applications.
The project started on the 1st April 2015 and will last 24 months.